Žďár nad Sázavou
Wastewater treatment
Delivery kind: Technological equipment for wastewater treatment
Place: Žďár nad Sázavou
Capacity: 39 400 PE
Commissioned: 11/2024
Place: Žďár nad Sázavou
Capacity: 39 400 PE
Commissioned: 11/2024
The reconstruction of the technological part included:
- mechanical pre-treatment
- inlet pumping station
- sedimentation tank
- thickening of primary sludge
- thickening of excess sludge
- sludge storage tank
- sludge dewatering
- boiler room with a 90 kW power plant running on natural gas and biogas