Assembly of new technological equipment on the two most important water sources for pipeline Lázně Bělohrad – Jičín, which supplies around 25 000 people with drinking water.
Project included:
- water treatment plant in Lázně Bělohrad, including water sources - wells J1, J2, ML5 (average output of the plant 25 l.s-1, maximal 42 l.s-1)- pumping station in Mlázovice, including water sources - wells ML1, V5a, V5b (capacity 22 l.s-1).